After a long and complex preparation of the soil (leveling, waterproofing, opening of the access road) finally at the beginning of September we laid the foundations of the new clinic.

In the following weeks we installed the sewage and the floor heating on a surface of more than 700 sq. m.Afterwards we added the concrete and we finished the first phase of the construction.During November we will raise the walls (in wood and characterized by a plug-in system) and will complete the insulation up to the roof and will assemble the external doors.